Username:
Password:










 
Wednesday, November 11, 2009
CLEANWAY Passes LLDA Upstream/Downstream Water Sampling

November 10, 2009, Laguna Lake Development Authority released the Result of Laboratory Analysis on the water samples collected by LLDA's investigation team from the nearby Labuyo creek during the site inspection undertaken last October 15, 2009.

 

WATER MONITORING RESULTS

Sampling Date: October 15, 2009

Results are from the LLDA

 

ANALYSES STANDARD Upstream Downstream
 Glass Electrode, pH
 6.0 - 9.0
 7.39 7.51
 Temperature, °C  - 28 24
 Total Dissolved Solids, TDS
 - 192 190
 Azide Modification (BOD5), ppm
 50.0 3 4
 Closed Reflux (COD), ppm
 100.0 9 13
 Gravimetry (TSS), ppm
 70.0 22 48
 Oil and Grease, ppm  5.0 <0.50 <0.50
 Alkalinity as CaCO3, ppm
 - 77.6 79.6
 Chromium (IV), ppm  0.1 <0.001 <0.001
 Calcium Hardness as CaCO3, ppm
 - 77.6 79.6
 Total Hardness as CaCO3, ppm
 - 71.6 74.6
 Chloride as Cl, ppm
 350 5.9
 6.4
 Turbidity, NTU
 -
 39 55
 Conductivity - 210 225
 Ammonia, ppm
 - 0.07 0.10
 Nitrates, ppm
 10 6.2 5.7
 Inorganic Phosphates, ppm
 0.4 0.26 0.31
 Total Phosphorus, ppm
 - 0.11 0.12
 Total Nitrogen, ppm
 - <1.0 <1.0
 Lead, ppm
 0.3 <0.1 <0.1
 Copper, ppm
 0.05 <0.05 <0.05
 Cadmium, ppm
 0.05 <0.003 <0.003
 Iron, ppm
 - 1.1 1.5
 Nickel, ppm
 - <0.01 <0.01
 Zinc, ppm
 - 0.06 <0.05

 



Back | E-mail | Print